The UpGrade
Select a Category: 

Return to Case Studies: The UpGrade | Click Here to Return to Whitley Manufacturing

Case Study:  The UpGrade Warehouse Expansion

View the Brochure PDF

Contact Whitley Manufacturing

Warehouse Expansion
Location: Odessa,Texas

Project size: 2650 SF

  • Relocatable
  • 3 Day Time Line
  • 15’1” Ceiling Height

Whitley proposed the use of a new series of industrial modular buildings called The UpGrade. The endwalls of the modules have the ability to fold under, allowing up to 3 modules to be shipped on a single flatbed trailer. Items such as siding, roofing, and electrical systems were pre-installed in our factory to minimize the on-site work. Once the modules arrived on site, a crane was used to lift the modules into place, allowing the endwalls to fold out. After the modules were bolted down to the slab and mateline close-up materials were put in place, the client was able to install their equipment inside of the finished building. Only a matter of a few hours passed from a bare concrete slab, to a finished, weather tight building. 


Return to Whitley Manufacturing

Whitley Manufacturing Co, Inc.
Corporate Office
201 West First Street
PO Box 496
South Whitley, IN 46787
+1 (260) 723 5131
+1 (260) 723 6949 fax

 


Modular Builders

2756 Fort Wayne Rd.
PO Box 505
Rochester, IN 46975-8613
+1 (574) 223-4934
+1 (574) 223-8779
Whitley Evergreen
14219 Smokey Point Blvd
Marysville, WA 98271
+1 (360) 653-5790
+1 (360) 659-7735 fax
Whitley East LLC
64 Hess Rd
Leola, PA 17540
Phone (717) 656-2081
Fax (717) 656-8149

Whitley Manufacturing | Contact Us | About Modular Construction | Modular Buildings | Portable Buildings
Medical or Healthcare Modular Buildings | School & Classroom Modular Buildings
Commercial Modular Buildings | Modular Banks | The UpGrade
Permanent Restrooms | Support Facilities | Equipment Shelters, Steel Enclosures | Green Modular Buildings


Copyright © 1995-2014 Whitley Manufacturing Co., Inc.
Read Our Terms & Conditions