Building Specs
Location: Harrisburg, Pennsylvania
Project Type: Distribution Center
Project Size: 22,000 SQ. FT.
Number of Units: 41 UpGrade Modules
Key Achievements
- Extremely fast setup time
- Two and a half times less material waste than traditional building
- Steel frame consists of 72% recycled materials
The Need
A major shipping company was projecting significant growth in their services due to the massive increase of e-commerce activity. They required a new facility for an additional package-sorting hub. New land acquisition also presented an opportunity for future expansion. But, the biggest challenge - it needed to be operational in less than 5 months.
The Solution
Whitley proposed the industrial, clearspan, modular structure called the “UpGrade”. With its proprietary structural design, the wall and roof components are joined together as one unit, making set-up extremely fast and cost effective. The end walls have the ability to fold under, allowing up to 3 modules to be shipped on a single flatbed trailer, reducing freight costs. Siding, insulation, and electrical systems are pre-installed in the factory also minimizing on-site work. Once the modules arrive, they are lifted by crane allowing the end walls to unfold into a vertical position. Within a day, all the modules are set, fastened to the concrete slab, and mate-lines are closed in by the finishing crew.
The Upgrade has been designed to be relocate-able. The flexible design allows the facility to add, remove or relocate to adapt with the changing business environment.