Mercer Island, Washington

Big space, even bigger time savings.

French American School

Location:

Mercer Island, Washington

Square Footage: 48,000 sq. ft.

Number of Modules: 25

Key Achievements:

- 50% faster than a conventional building timeline
- Minimal disruption to the school campus.
- Steel framing consisted of 72% recycled material.

The 

Challenge

Expansion + Timelines

During the initial project, the school required a new building that was cost conscious and could quickly replace their existing facility. Their growth plans called for future expansion and the building was designed with the flexibility to easily accommodate this.

The 

Solution

Efficiency + Design

The initial project occurred over summer recess. In the fall, the students returned to to class in a state-of-the-art 18,000 square foot facility. As the schools’ growth continued on schedule, they soon took advantage of their building’s flexible design. A second story was constructed off-site, and when spring recess arrived, Pacific Mobile sprang into action, effectively doubling the size of the school over Spring Break.